Friday, March 30, 2012
Flower Arranging by Robin
When I walked into the store March 10 , these flowers catch my eye. I brought them home and arranged them. It really brightened my day.
Monday, March 26, 2012
A Big Turn on the Quilt
Saturday, March 24, 2012
Quilt Update
Saturday, March 17, 2012
Quilt Progress
I have just rolled the quilt for the third time. I have been working on it for 4 weeks now and have tracked my time. I get more done when I am listening to something rather than watching tv. I have worked on the quilt for 35 hours and 20 minutes so far.
Saturday, March 10, 2012
A Fun Saturday in the Back Country
On Saturday March 3, 2012 we went for a ride up the 5 freeway to the Lockwood Valley highway. It was a beautiful day. It was really warm also. Here are a few pictures of the day.
We remembered the beach chairs. Jeff sat there and just plinked away for more than an hour.I sat in the shade of the Jeep knitting with my big earphones on and my music going while Jeffrey did his target practice. I was able to balance everything on my lap and chair. There is a cup-holder at the end of the arm chair. The bottom of the cone in the yarn fit in it just perfectly so that it would not fall off into the dirt. I was really set.
It was a fun day. The weather was beautiful. It was fun to be out in nature together enjoying the things we like to do.
Monday, March 5, 2012
Almost the same
I added up the time I spent on the quilt last week. There were 2 days I didn't do anything. When I was done adding it up there was only about 15 minutes difference between the weeks. 8 hours and 24 minutes and 8 hours and 15 minutes. I have gone 1/2 the width of the quilt and am headed back to the middle.
Subscribe to:
Posts (Atom)